Screw pump is the most commonly used mechanical oil extraction method in the world, and its most common operation problem is that the pump can not be fully filled, resulting in low productivity. The incomplete filling of pump is due to the pump capacity greater than the well output or the poor gas separation at the pump inlet, and part of the pump displacement is lost due to the interference of gas in the pump and the control of the pump operation time, so as to make the pump displacement and flow Matching the amount of fluid entering the bottom hole can improve the efficiency and reduce the cost. The specific methods to maintain the high production rate of screw pump are as follows:

1. Sound wave liquid level measurement should be carried out to determine the relative depth between the production liquid level and the pump suction inlet. If the liquid level is higher than the pump suction, it is impossible for the well to produce at maximum production. If the gas interference affects the production rate, the liquid level is higher than the pump suction; if the pumping volume is too large to cause low production, the liquid level should be at or near the pump suction.

2. The motor power and indicator data can be obtained simultaneously by using the comprehensive data acquisition system. One of the main uses of indicator diagram is to diagnose how the pump works and to analyze downhole problems. The application of production liquid level measurement combined with indicator diagram can be used to know whether the well is producing at the maximum production rate, whether the liquid column height is higher than the depth of the pump inlet, whether the pump is not fully filled and whether the free gas migrates upward along the casing annulus.

3. Diagnosis of low energy efficiency wells. The diagnosis method is to determine the total efficiency of the pumping system, which only needs to measure the input power of the prime mover, determine the bottom hole production pressure and accurate production test data. Generally, the total efficiency of beam pumping system should be about 50%. If it is lower than this, its performance should be improved. Techniques to improve total efficiency include maintaining high volumetric efficiency (matching pump size with wellbore injection volume, eliminating gas interference, controlling pumping with a pumping controller or timer) and replacing excessive motors.

4. Downhole gas separation. Invalid pump operation is often caused by air interference, which can be diagnosed by acoustic liquid level measurement and indicator diagram. It is best to place the pump suction at the bottom of the fluid into the zone, if placed above, gas separator should be used. If the valve seat nipple is arranged at least 10ft below the bottom of the fluid entry section, effective gas separation can occur in the annulus, and the casing acts as the outer cylinder of the separator. However, the conditions of the well often do not allow the pump to be placed below the fluid entering layer, so downhole gas separator should be considered. The conventional gas separator is composed of fluid entering part (such as perforating nipple), outer cylinder (such as a section of tubing with plug at the bottom) and liquid sealing pipe at the bottom of pump.

5. The displacement of the pump can be controlled by adjusting four parameters: plunger size, stroke length, pump stroke number and daily operation time. Due to the high cost of pumping equipment, the pump with inappropriate size is not usually replaced. The simplest way is to change the configuration of the ground equipment, such as moving the beam rod to change the stroke length of the ground and the pump; the second is to replace the motor pulley to control the pump stroke number. The matching problem of pump volume and well productivity can be realized by changing the daily operation time. The following devices can be used to control the operation time: air pumping controller, interval timer and percentage timer. If the air pump controller detects that the pump is not fully filled, it will stop the pump. The timer controls the running time of the pump, which is cheap and easy to operate. The duration of pump stop should be short to the bottom hole production pressure rise no more than 10% of the reservoir pressure. The operator can measure the above acoustic wave and indicator for each well within 45min to determine the well productivity, downhole pump performance, downhole gas separator performance, sucker rod and beam pumping unit load and motor performance. Through the analysis of 45min, the operator can make the well production maximum and reduce the operation cost.

Technology Department


Address:576 Wuding Road, Jing'an District, Shanghai

E-mail:info@xinguangminggroup.com

亚洲天堂免费在线播放| 强暴美女视频大全久久久| 夫妻性生活一级片视频| 久久免费看少妇高潮av| 蜜臀av免费在线观看| 白白色最新福利视频二| 小骚货操死你视频在线观看| 在线免费观看欧美黄片| 91精品在线观看首页| 久久久久久精品妇女| 日本女优高清不卡一二三四区 | 日韩欧美一区二区三级| 色婷婷狠狠久久综合中文一本| 另类欧美亚洲中文在线综合| 亚洲欧美一区日韩尤物| 成人在线一区二区三区观看| 尤物在线观看视频播放| 亚洲av产在线精品亚洲第| 亚洲av日韩精品久久久| 另类国产人妖免费视频网站大全| 精品一区二区三区亚洲| 91天美精东果冻麻豆| 九九在线免费视频蜜臀| 国产另类极品熟女露脸自拍| 日韩av在线国产观看| 区二区三区毛片乱码免费| 亚洲av在线av天堂| 色哟哟亚洲精品在线视频| 人人妻人人澡人人爽人人老司机| 少妇午夜福利一区二区| 亚洲精品区免费观看av| 中文字幕亚洲欧美日韩高清 | 粉嫩极品美女国产精品| 尤物视频官网在线观看| 亚洲国产欧美日韩一区| 亚洲免费视频区一区二| 日本中文字幕在线一区| 中文字幕日本乱码精品久久| 日韩人妖视频在线观看| 久草区免费在线视频播放| 免费特黄特黄的欧美大片|