婷婷伊人久久大香线蕉av-国产日韩欧美在线综合网-精品亚洲国产成人蜜臀优播av-五月亚洲丁香激情综合

How to use submersible pump for well to run normally

Date of issue:[2020-08-17]     Click through rate:    

Well submersible pump is mainly water immersion and oil immersion, both of which are composed of water pump and motor. In order to ensure the normal operation of the electric pump, it must be carried out according to the following methods.

1. Before using the electric pump, use a megohmmeter to check the insulation resistance of the motor, and the minimum value should not be less than 5 megohm. The inspection method is to connect a terminal on the megger to the cable line of the electric pump, and connect the other terminal to the motor shell. Shake the megger and observe the insulation resistance value.

2. Check the cable for ground cracks and scratches. If there is any damage, it should be replaced in time to prevent leakage.

3. The water immersion motor should open the irrigation bolt, fill with clean water, tighten the bolt, and then dive into the water. If oil leakage is found in the oil immersed motor, the sealing element should be replaced before diving into the water.

4. Before the electric pump submerges into the water, fill the pump with clean water, empty for 1-2 minutes, and start it twice to check whether the idling and starting are normal. If the direction is opposite, switch the two-phase wiring.

5. Check whether the lifting pipe has cracks and whether the connection is firm.

6. When the electric pump is submerged or lifted, the cable shall not be pulled to avoid cable damage or disconnection at the joint.

7. The power supply voltage should be controlled within 5% of the rated voltage. If the voltage is too high or too low, the motor will be damaged.

8. The electric pump shall be vertical when diving into the water, and shall not be inclined.

9. The electric pump shall not transport water or mud with more sand content. The sand particles in the motor cavity should be cleaned frequently and the clean water in the motor cavity should be replaced.

10. The actual head of the pump should be within 0.8-1 rated head. This can improve the working efficiency of the electric pump, save electricity, avoid overload operation of the motor, and prolong the service life.

11. After the pump is used, it should be cleaned, coated with oil on the metal surface to prevent rust, and keep it in a dry place vertically. Water immersion motor should also discharge clean water in the motor.

Technology Department


Address:576 Wuding Road, Jing'an District, Shanghai

E-mail:info@xinguangminggroup.com

日本欧美高清一区二区| 一本色桃子精品久久中文字幕| 亚洲欧洲一区二区免费| 中文字幕乱码亚洲精品一区| 欧美黄色影院在线观看| 69久久精品费精品国产| 亚洲午夜av久久乱码| 持续侵犯人妻中文字幕| 熟女人妻av五十路六十路| 欧美精品欧美激情免费区| 色婷婷综合五月在线观看| 夜夜草视频在线免费观看| 视频在线观看亚洲午夜福利| 天天操天天射夜夜爽| av免费在线不卡一区| 操老熟女一区二区三区| 中文字幕人成乱码在线观看| 91九色在线免费观看| 久久亚洲中文字幕丝袜长腿| 国产av剧情精品麻豆| 日本女优高清不卡一二三四区| 日韩欧美亚洲综合另类| 亚洲欧美日韩成人在线观看| 欧美亚洲精品在线观看| 一级片一区二区中文字幕| 尤物视频网站在线观看| 国产伦理自拍视频在线观看| 成人18禁视频免费看| 国产日产精品久久婷婷色 | 欧美日韩伦理片在线观看 | 高清日韩精品视频在线观看 | 久久综合中文字幕一区| 这里只有精品国产999| 人妻少妇亚洲精品视频| 五月天亚洲激情综合av| 亚洲国产精品第一区第二区| 少妇按摩高潮呻吟av| 另类欧美亚洲中文在线综合| 国产男女免费操作视频| 九月丁香花开综合网| 国产美女高潮流白浆视频免费看 |